CO in Hand: What the Next 30 Days Look Like Before You Move In

Chase Lamson, President of SouthShore Builders
Chase Lamson··6 min read
Completed work at a custom home in Palm Beach by SouthShore BuildersSee this home: La Costa Dr →

Short answer

After the Certificate of Occupancy is issued, most custom homes in Palm Beach County still need 2 to 4 weeks of punchlist work, landscaping installation, pool filling, and final utility activation before move in is realistic. The CO means the structure is legal to occupy, not that every detail is complete.

Most buyers in Delray Beach celebrate the Certificate of Occupancy as the finish line. We understand why. Getting the Palm Beach County building department to sign off on a ground up custom home involves hundreds of inspections, coordination across dozens of trades, and months of work. But the CO is really the starting gun for the final phase, not the end of the race. Expect two to four weeks of focused activity between CO issuance and a move in that actually feels ready.

What does the CO actually confirm?

The Certificate of Occupancy tells the county, and your lender, that the structure meets the Florida Building Code and is legally habitable. It does not mean the tile grout is perfect, the pool is filled, the sod is green, or the irrigation timer is set. Palm Beach County building department inspectors check life safety systems, structural compliance, electrical panels, plumbing rough in, and HVAC. They are not reviewing whether your cabinet hardware matches your plumbing fixtures. That is our job, and we do it through a formal punchlist process.

How the punchlist process works on our builds

Completed work at a custom home in Palm Beach by SouthShore Builders

Before we hand you a key, we walk every room ourselves. Our site supervisor goes through the home with a printed checklist that covers paint touch ups, door alignment, caulk lines, grout joints, appliance operation, outlet covers, window hardware, and trim gaps. We log every item with a photo and a trade assignment. Then we do the walk again with you. On homes we build in the Palm Trail neighborhood, Lake Ida, and the NE 7th Avenue corridor, that owner walk typically runs two to three hours for a 4,000 square foot home. You will find things we missed. That is exactly why we do the walk together. Everything on the combined list gets a completion date before we schedule your move in.

If you are curious about how the punchlist fits into the broader construction timeline, our custom home building process page lays out each phase from permitting through final delivery.

Landscaping, grading, and pool fill after CO

Completed work at a custom home in Palm Beach by SouthShore Builders

Florida weather and the sequencing of trades mean that landscaping almost always happens after CO. Installing sod or plantings before the last concrete truck or framing crew finishes tends to destroy them. After CO we complete final grading to match the approved drainage plan, install sod, place any specified palm trees or native plantings, and activate the irrigation system zone by zone. In Seagate and the neighborhoods along Federal Highway east of I-95, irrigation water sources and pressure vary, so we test every head before we consider that item closed.

Pool fill is a separate step that buyers often underestimate. A typical residential pool in Palm Beach County holds 15,000 to 25,000 gallons. Filling from a garden hose takes two to three days. The pool contractor then adjusts chemistry, balances calcium hardness and alkalinity, primes the pump, and programs the automation system. Plaster pools require a startup brushing schedule for the first two weeks. We coordinate this directly with the pool subcontractor so the pool is swim ready, not just full, by move in.

Utilities, accounts, and smart home activation

FPL, the water utility, and any gas provider each require their own account setup, and some require a physical visit to the meter before service activates under your name. We handle the builder accounts through CO and then walk you through the transfer process. If your home on Atlantic Avenue or anywhere in east Delray Beach includes a whole home automation system, structured wiring, or a solar array, the AV and electrical subs need a final programming session with you present. Plan two to three hours for that session. It is not optional and it cannot happen remotely.

What your warranty covers and when it starts

Ready to map out your build timeline?

Send us your lot address and a rough program for your home. We will put together a phase by phase schedule that includes CO, punchlist, and your realistic move in window.

Send Us Your Lot

Florida Statute 553.84 and the Implied Warranty of Habitability give you one year of coverage on workmanship and systems and ten years on structural defects. At SouthShore Builders, we document the warranty start date in your closing package. That date is typically your closing date or your move in date, whichever comes first, not the CO date. We want that in writing so there is no ambiguity if you call us in month eleven about a hairline crack above a door frame.

For warranty service, you submit a written request through our office. We triage it within 48 hours on business days. Items that affect habitability, a failed AC, a plumbing leak, a non functioning electrical circuit, get a same day or next day response. Cosmetic items are batched and addressed within 30 days. That schedule is in your contract before you sign it.

We build in Delray Beach, Boca Raton, and throughout Palm Beach County, and we stay reachable after the keys change hands. If you want to understand how we structure the post CO phase before you commit to a builder, reach out to us directly.

SouthShore Builders treats the 30 days after CO as seriously as we treat framing and foundation. The details you notice every day, the way a door closes, how the pool looks at dusk, whether the sod took, are the details that define a finished home. If you are planning a ground up build in east Delray Beach or Palm Beach County and want to talk through the full timeline from lot to move in, visit our contact page and send us your lot address or project details.

Key takeaways

  • A Certificate of Occupancy confirms code compliance but does not mean the home is ready for furniture and daily life.
  • Punchlist items, final grading, sod, and pool fill typically take two to four weeks after CO in Palm Beach County.
  • Your builder warranty clock usually starts on the date of closing or move in, not on the CO date, so confirm this in writing.
  • Florida law requires a one year workmanship warranty and a ten year structural warranty on new construction.
  • Coordinating utility accounts, irrigation activation, and pool chemistry before move in day prevents avoidable delays.

How do the options compare?

  • Certificate of Occupancy issued: Palm Beach County confirms code compliance. Life safety systems, structure, and mechanical are approved. Cosmetic and site work may be incomplete.
  • Punchlist phase (weeks 1-2 after CO): Builder and owner walk the home together. Trades return to close paint, trim, hardware, grout, and appliance items on a written list with assigned completion dates.
  • Site completion (weeks 2-3 after CO): Final grading, sod installation, irrigation activation, pool fill and chemistry balance, and outdoor lighting programming are completed and tested.
  • Utility transfer and smart home activation (week 3-4): FPL, water, and gas accounts transfer to owner. AV integrator and electrician complete final programming of automation, solar, and structured wiring systems with owner present.
  • Move in: Punchlist is closed in writing, all utilities are active under owner accounts, pool is swim ready, and irrigation is running on a programmed schedule.

"The CO is the county's signal that the building is safe to occupy, and our signal that the finish work begins in earnest."

Sources

  • Florida Building Code, Chapter 553 Workmanship and Structural Warranty Requirements
  • Palm Beach County Building Division, Certificate of Occupancy Process

Frequently Asked Questions

Can we move furniture in immediately after the CO is issued?

Technically you can, but we advise against it. Punchlist trades will still be moving through the home, and moving furniture in before paint touch ups and flooring final coats creates scheduling conflicts. Most buyers wait until the punchlist is fully closed, which is typically two to four weeks after CO.

Who fills out the punchlist, us or the builder?

Both. We walk the home first and generate our own list. Then we walk again with you and add whatever you identify. The combined list is what gets resolved before move in. Having your own notes ready for the walk helps move things faster.

Does the warranty start on the CO date?

In most cases, no. At SouthShore Builders, the warranty start date is tied to your closing or move in date, whichever comes first. Florida's statutory warranties run one year for workmanship and ten years for structural defects from that date. Confirm the specific date in your contract before you sign.

How long does it take to fill and balance a new pool in Palm Beach County?

Filling a standard residential pool takes two to three days. After fill, the pool contractor adjusts chemistry and programs the automation system, which adds another one to two days before the pool is ready to use. Plaster pools also require a two week brushing startup schedule.

What if the landscaping dies after we move in, is that covered under warranty?

Plant material warranties vary by subcontractor and species. We document what was installed and what warranty the landscape sub provides at handoff. Sod and trees typically carry a 30 to 90 day establishment warranty depending on irrigation performance. We include that documentation in your closing package.

Chase Lamson
Chase Lamson

President, SouthShore Builders

Chase Lamson leads SouthShore Builders with decades of South Florida custom home experience. SouthShore is a licensed general contractor serving Palm Beach County and Broward County.